3-story building planned for Birmingham’s Peabody Block

Preliminary site approval has been granted for the construction of a three-story building for Birmingham’s Peabody Block, at Woodward and Maple. Planned tenants include Lasalle Bank and a health spa, with third-floor office space still available.

Getting your Trinity Audio player ready...

Preliminary site approval has been granted for the construction of a three-story building for Birmingham’s Peabody Block, at Woodward and Maple. Planned tenants include Lasalle Bank and a health spa, with third-floor office space still available.

Excerpt:

[Planning director jenna] Ecker said the three-story building will provide more of an architectural statement over the previous proposal. While she’s not thrilled with the idea of a drive-through bank in the heart of a walkable community, she noted the entrance to the drive-through is off Peabody and designed in such a way to make it more pedestrian friendly.

“I think the mix of uses is exactly what we want to see downtown,” she said Friday. “That block has always been a target for redevelopment.”

Read the entire article here.

Author

Our Partners

City of Oak Park

Common Ground Is Brewing

Support local stories and receive our signature roast straight to your door when you join at the Standard level (or above).

Drink Better, Read Local

Close the CTA

Don't miss out!

Everything Detroit, in your inbox every week.

Close the CTA

Already a subscriber? Enter your email to hide this popup in the future.